Rebar Stock Cutting Calculator

Segments, offcut, purchase quantity and utilisation.

Inputs

m
pcs
m
mm

Result

Formula

Segments = floor((stock + kerf) ÷ (need + kerf))
Offcut = stock − n×need − (n−1)×kerf
Bars to buy = ceil(pieces ÷ segments)
Utilisation = finished length ÷ (bars × stock)
3.5 m pieces, 500 of them, on 12 m stock: 3 per bar with 1.5 m left, 87.3% utilisation, 167 bars. On 9 m stock: 2 per bar with 2 m left, 250 bars, and utilisation drops to 77.8%.

FAQ

Why is longer stock more efficient?
Each bar carries a fixed offcut. Cutting 3.5 m on 12 m yields 3 pieces and 12.5% waste; on 9 m only 2 pieces and 22%. Longer stock means more segments and a smaller waste fraction. But it turns bad when the piece approaches half the stock: 6.5 m on 12 m gives one piece and 46% waste - lap it or change the stock.
Can offcuts be counted as usable material?
Only if some component needs that length - 1.5 m pieces suit stools, ties and short stirrups. Otherwise they are scrap at roughly a quarter of the bar price. List offcuts first, see what can absorb them, then choose stock length. That is where bar-bending yards actually save money.
Why count kerf loss?
Every cut removes 3-10 mm (more with an abrasive saw). Three pieces from one bar mean 2 cuts, or 4 if both ends are trimmed - 20-40 mm of loss. Trivial per bar, it becomes 20-40 m over a thousand. For precision work such as coupler splices with square-cut ends, it must be included.