算BuildCalc

Force Unit Converter

kN, N, tonne-force, kgf and lbf for loads and lifting.

Inputs

Result

Formula

Base1 kN = 1000 N, 1 MN = 1000 kN
Gravity1 kgf = 9.80665 N, 1 tf = 9.80665 kN
Anglo-American1 lbf = 4.44822 N, 1 kip = 1000 lbf = 4.44822 kN
Mass and force1 t of mass produces 9.80665 kN of weight
Site ruleTake 1 t ≈ 10 kN, a 2% overestimate
One tonne-force is 9.80665 kN, 1000 kgf or 2204.62 lbf. A sling rated 50 kN is about 5.1 tf; with a safety factor of 6 each leg may lift 0.85 t.

Force and load unit reference

UnitSymbolIn kNIn tonne-forceTypical use
KilonewtonkN10.102Structural loads
NewtonN0.0010.000102Small members
DekanewtondaN0.010.00102European marking
Tonne-forcetf9.806651Lifting weights
Kilogram-forcekgf0.0098070.001Old codes
Kipkip4.448220.4536US structures
Pound-forcelbf0.0044480.000454US customary

FAQ

Why are loads in kN rather than kg?
The kilogram measures mass and the kilonewton measures force, and structures respond to force. The same one-tonne machine weighs 9.8 kN on Earth and 1.6 kN on the Moon. A code live load of 2.0 kN/m² is a force, about 204 kg/m² of mass — which is where the “200 kg per square metre” floor label comes from.
How do wire rope tonnages convert to kN?
Multiply by 9.80665. A rope rated 10 t has a breaking force near 98 kN; divide by the safety factor for working load — 6 for lifting, 14 for man-riding. Check whether the maker quotes breaking force or working load, because they differ sixfold and getting it wrong kills people.
How heavy is 1 kN really?
About 102 kg — one adult, or two bags of cement. On site, allow roughly 1 kN per 100 kg: a 6 m length of 25 mm bar is 23 kg or 0.23 kN, and a 1 m² plate 10 mm thick is 78.5 kg or 0.77 kN.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.