Masonry Tie Bar Calculator

Tie bar count, weight, holes and resin from wall and spacing.

Inputs

m
mm
Not more than 500 mm and at least 2 per storey
pcs
1 for 120 walls, 2 for 240, 3 for 370
mm
At least 1/5 of wall length and not less than 700 mm
ml

Result

Formula

Coursesn = floor(height ÷ spacing), at least 2
Total barsN = courses × bars per course
Total lengthL = N × length into wall
WeightW = L × 0.00617 × d²
ResinV = N × resin per hole
A 3 m wall at 500 mm spacing with 2 Φ6 bars per course extending 1000 mm: 6 courses, 12 bars, 12 m total, 2.66 kg, 12 holes and about 180 ml of resin.

FAQ

Must tie bars be resin-anchored?
Depends on the structure. Columns can be cast-in or drilled-in, shear walls usually have starter bars or resin anchors, and infill-to-tie-column joints are normally cast in. Cast-in is most reliable but easily misplaced; resin anchoring is flexible but needs drilling, cleaning, injection, curing and pull-out tests. Bars missed during the frame stage are the commonest source of rework.
Why at least two courses per storey?
With only one tie the infill can rotate about it like a door, cracking and spalling away from the beam soffit. Two or more courses restrain the panel in the frame plane. Seismic areas also require continuous bars tied into the tie columns to make the panel act as a unit.
How is pull-out testing done?
Sample at least three bars per inspection lot, load to 1.2 times the design value, hold two minutes, and pass if there is no slip or cracking. A failure means doubling the sample; a second failure invalidates the lot, requiring extra bars or a different connection. Keep the records — they are checked at handover.