算BuildCalc

Privacy Policy

This page sets out what the site does and does not do with data. In one sentence: every number you type into a calculator stays in your own browser.

What we do not collect

Support chat and feedback

The bottom-right corner has a support chat and feedback form. Only when you submit something yourself does the following reach the server:

This is used only to improve the tools and to reply to you. It is not shared, not cross-analysed and not passed to any ad system. Questions the assistant could not answer are also logged as anonymous text for a single purpose: adding the answer to the FAQ or building the calculator that was missing.

Server logs

Like almost every website, the hosting provider keeps access logs — typically IP address, time, requested page and browser type — for troubleshooting and security. They are not merged with any analytics on this site and are not used to identify individuals.

Cookies and third-party analytics

This version of the site sets no cookies of its own.

To know how many people visit, the site uses a lightweight third-party visit counter (busuanzi, busuanzi.ibruce.info). It records only two totals — page opens and unique visitors — and shows them in the footer. It does not record any value you type into a calculator, does not track your path through the site, and builds no personal profile. If you prefer not to be counted, block third-party requests or use an ad blocker; every calculator still works normally.

The site may carry third-party advertising such as Google AdSense. If it does, the ad network may use cookies to serve ads based on your prior visits to this and other sites. You can block cookies in your browser settings, or manage personalised advertising through Google Ad Settings. We do not control third-party cookies; their own privacy policies apply.

External links

Some pages link to other sites. Their data practices are not covered by this page — read their own policies.

Children

This is an engineering tool and does not knowingly collect information from children.

Changes

If data handling changes — for example when advertising or analytics are enabled — this page will be updated and the effective date below revised.

Effective date: 24 October 2026.

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.