算BuildCalc

Timber Volume and Weight Calculator

Volume, board area and weight for timber by species density.

Inputs

m
mm
mm
pcs
kg/m³
Pine 450-550, fir 350-400, hardwood 700-900

Result

Formula

Volume per pieceV = length × width × thickness in metres
Total volumeV × quantity
MassV × air-dry density
Board areatotal volume ÷ thickness
Pieces per m³N = 1 ÷ volume per piece
Board feet1 m³ ≈ 423.8 bf
Twenty pieces at 40 × 200 × 50 mm and 500 kg/m³: 0.0400 m³ and 20.00 kg each — 0.8000 m³ and 400.0 kg in total, equivalent to 16.00 m² of 50 mm board.

FAQ

Why is timber sold by volume, not weight?
Because value follows usable volume and yield, not mass. The same volume of pine and hardwood differs twofold in weight yet yields identical members. Selling by weight rewards wet timber — 20-40% heavier but no more product — which is exactly why timber is settled by volume.
How do sawn timber and plywood convert?
By volume: 1 m³ is 20 m² at 50 mm, 33.3 m² at 30 mm and 55.6 m² at 18 mm. But sawn timber is solid and plywood is laminated, so they are far from interchangeable. In formwork the sawn member is the bending-resistant bearer while plywood is the wearing face — quantity them separately.
Does moisture content affect volume much?
Volume little, weight a lot. Drying from green to air-dry shrinks volume 3-8% but cuts mass 20-40%. That is why timber machined straight after delivery comes out undersized, and why timber codes require 15-20% moisture before installation — otherwise it cracks and distorts afterwards.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.