Room Area Calculator

Floor, ceiling, walls, skirting and volume, all at once.

Inputs

m
m
m
Floor to ceiling, not storey height
m²
Door and window openings, added up
m
Skirting stops at door openings

Result

Formula

Floor / ceilingA = length × width
PerimeterP = 2 × (length + width)
Gross wall areaA = P × clear height
Net wall areaA = gross − openings
SkirtingL = P − total door width
VolumeV = length × width × clear height
A 6 × 4 m room at 2.8 m clear height with 4 m² of openings and a 0.9 m door: 24.00 m² floor and ceiling, 52.00 m² of net wall, 19.10 m of skirting, 67.20 m³ of volume and a wall-to-floor ratio of 2.17.

FAQ

Why not just multiply floor area by 3 for walls?
The “times 3” rule is a fit-out shortcut that only holds for roughly square rooms at 2.7-2.8 m. The longer the room, the worse it gets: a 6 × 4 m room has a wall-to-floor ratio of 2.17 while 3 × 8 m gives 1.83 — nearly 20% apart. Wall area drives paint and filler quantities, and running short mid-job risks a colour mismatch.
Should openings be deducted?
Yes for finishes such as paint, wallpaper and wall tiles. For filler and primer either is accepted and most estimators leave them in as margin. But the reveals — the inside faces of the opening — must be added: a 1.5 × 1.5 m window in a 200 mm wall has about 1.2 m² of reveal, so four windows is close to 5 m² that is easily forgotten.
How do clear height and storey height differ?
Storey height runs between structural floors; clear height runs from finished floor to underside of ceiling, the difference being slab thickness plus floor build-up. A 3.0 m storey usually gives 2.7-2.8 m clear. Wall areas must use clear height — using storey height overstates by about 10%, two extra tubs of paint across ten rooms.