Heating Load Calculator

Load, radiator sections, fuel use and running cost.

Inputs

m²
m
W/m²
Efficient housing 40-60, ordinary 60-80, public 80-120
°C
°C
days
CNY/m³

Result

Formula

Loadarea × heat index in watts
Volume checkvolume × 0.55 × ΔT
Radiator sectionsload ÷ output per section
Gas rateQ × 3.6 ÷ (35.6 × efficiency)
Season usehourly rate × hours/day × days
Units1 kW = 860 kcal/h = 3412 BTU/h
100 m² at 60 W/m², 18°C indoors against −5°C outside over 120 days at 2.8 per m³: 6.00 kW (volume method 3.79 kW), 50 radiator sections, 0.67 m³/h of gas, 971 m³ for the season and about 2718 in cost.

Reference heating indices by building type

Building typeHeat index W/m²Note
Housing (65% efficiency)40-50Built in the last decade
Housing (50% efficiency)50-60Around 2010
Older housing80-100No insulation, single glazing
Office70-100Including ventilation
School, nursery60-80Intermittent use
Retail80-120High fresh-air demand
Hospital80-120Runs 24 hours

FAQ

Why does the index vary twofold?
Because insulation levels differ. U-values fall from 1.8 W/(m²·K) for old 240 mm brickwork to 0.4 with external insulation and double glazing — a fourfold gap. Windows are the weak point, losing 40-50% of a house's heat with single glazing, which is why replacing windows usually beats thickening walls.
What indoor temperature is right?
18-20°C is the comfort band for dwellings. Each degree adds 6-8% to energy, so lifting a 100 m² home from 18 to 22 costs an extra 600-800 over a season. Below 16 it is uncomfortable; above 24 the air is dry, occupants get headaches and consumption jumps. Hospitals and public buildings follow their own standards, with theatres at 22-25°C.
Radiators or underfloor heating?
Underfloor runs at 35-45°C supply, feels better with warm feet and cool head, frees the wall, but heats up slowly over 4-6 hours, raises the floor 60-80 mm and is hard to repair. Radiators run at 70-85°C, warm a room in 20 minutes and are easy to service, but take wall space and stir dust. Tight floor-to-ceiling or intermittent use favours radiators; continuous occupation favours underfloor.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.