算BuildCalc

Glass Weight Calculator

Mass per square metre, per pane and in total for glass.

Inputs

mm
mm
mm
For sealed units use one pane thickness and 2 panes
pcs
1 single, 2 for sealed or laminated
pcs

Result

Formula

AreaA = length × width in metres
Mass per m²W = thickness × 2.5 × panes
Mass per unitA × W
Totalper unit × quantity
Density basis2500 kg/m³ = 2.5 kg/m² per mm
Sealed unitsAdd the panes, ignore the cavity
1200 × 600 × 10 mm single glazing, six panes: 0.720 m² and 18.00 kg each, 108.00 kg total. Made as 6+12A+6 sealed units the same size is 21.60 kg — beyond one person.

FAQ

Why exactly 2.5 kg per square metre per millimetre?
Float glass is about 2500 kg/m³, and 1 m² at 1 mm is 0.001 m³, so 2.5 kg. The relation only holds with thickness in millimetres and area in square metres. Toughened and laminated glass runs 2.5-2.56, within 2%, so 2.5 is used on site.
How do I know if a pane can be handled manually?
Go by mass: under 30 kg one person can carry it a short way, 30-50 kg needs two, 50-120 kg needs vacuum lifters and at least three, and above 120 kg plan for mechanical handling. Size matters too — anything over 2.4 m long twists and cracks even when light, so carry it upright, never flat.
How is curtain wall load estimated?
Take the self weight from this tool and add wind. The characteristic wind load is the 50-year basic pressure times shape, height and gust factors — about 1.0-2.0 kN/m² inland, 3-4 kN/m² on a coastal high-rise. A 30 kg/m² sealed unit is only 0.3 kN/m², so curtain walls are governed by wind, not weight.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.