算BuildCalc

Drainage Pipe Slope Calculator

Standard slope by diameter, fall over the run and velocity check.

Inputs

m
%
Not less than standard, and not excessive

Result

Formula

Falllength × slope
Slopefall ÷ length as a decimal
Velocity(1/n) × R^(2/3) × i^(1/2)
Hydraulic radiusd ÷ 4 for a full circular pipe
Self-cleansingv ≥ 0.6 m/s
Standard slopes2% at DN110, 1% at DN160
DN110 over 20 m at 2%: a 0.400 m fall, 20 mm per metre and 0.99 m/s full-bore — self-cleansing. Drop to 1% and velocity falls to 0.70 m/s, where solids settle over time.

Standard and minimum drainage slopes

DNStandard slopeMinimum slopeFall per 10 m at standardFall per 10 m at minimum
DN503.5%2.5%350250
DN752.5%1.5%250150
DN1102.0%1.2%200120
DN1601.0%0.7%10070
DN2000.8%0.5%8050
DN3150.5%0.3%5030

FAQ

Why is a steeper drain worse?
Because fast water outruns the solids. On a steep run the flow is swift but shallow, so solids roll along the invert and stall wherever the gradient eases or a joint interrupts them, building a blockage. Codes cap branch slopes at about 15%, beyond which you use a backdrop or a larger pipe. It is the opposite of supply pipe logic, which catches people out.
What matters with floor drains and traps?
Use a trapped gully with a seal at least 50 mm deep, or sewer gas comes back — the commonest cause of bathroom smells. Traps need the same 50 mm seal, and rarely used drains must be topped up. Branch runs beyond about 4-6 m need a rodding eye, or a blockage cannot be cleared.
Is rainwater pipe sloped like drainage?
No. Rainwater carries high flow and grit but little organic matter, so slopes can be gentler — 1% at DN100 — while the upper velocity limit is stricter, 5 m/s, to prevent erosion. The base of a roof downpipe needs an energy dissipator, since water falling ten metres or more hits hard. Storm and foul must be kept separate; cross-connection fails environmental inspection.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.